# Construction time tracking: turn a shift into a clear time entry

Canonical: https://tuntiva.com/en/guides/construction-time-tracking/
Language: en
Tuntiva product team. Reviewed: 2026-10-03.

## Quick answer

Construction time tracking links each shift to a worker and a site. Record start and end times and breaks consistently, then have a supervisor review the entry before payroll. Tuntiva brings this workflow into one company workspace.

## What should a shift record contain?

A daily total alone may not explain where the work took place or why an entry changed. A consistent recording method makes review easier when workers move between sites.

Record the worker, work date, site, start, end and breaks. Add a work description where useful. Keep ordinary hours and other hour categories clearly identified; how those categories affect pay depends on your company's agreed rules.

- The same site name for every worker
- One agreed way to record breaks
- A named reviewer and review schedule

## Agree the routine before the first shift

Show workers how to select a site, start a shift and end it. Explain what to do when a shift is left open or entered afterwards. A short shared instruction is more useful than a long list of features.

In Tuntiva, a worker can join with a code supplied by the employer. The mobile workflow records shifts on the phone and shows the worker's own hours. Employers use the web app in a browser.



## Handle missing or incorrect entries

Before approval, check open shifts, missing sites and unusually long entries. Ask the worker for clarification where needed. Correct the relevant entry instead of maintaining a separate correction list in messages.

If a mobile entry was recorded offline, wait for synchronisation before reporting. The supervisor and accountant should use the same hours and approval status, rather than different versions of a file.



## When is a spreadsheet enough?

A spreadsheet can work for a small team when one person consistently collects and checks the data. More workers, sites and reviewers increase the effort of managing versions and missing entries.

A shared workspace helps when workers record their own time, supervisors review it and accounting needs approved data. Choose a system by that workflow, its permissions and the export format you actually need.



## Worked example

A worker starts at Site A at 07:00 and finishes at 15:30, with a 30-minute break. The elapsed period is 8 hours 30 minutes; after subtracting the break, the entry contains 8 working hours. The supervisor checks the site, times and break before approval. This is an arithmetic example, not a rule for calculating overtime or allowances.

Begin with one site and one shared instruction. Make sure a worker can submit an entry and a supervisor can find it for review. Expand only when that chain works.

These guides describe work processes and Tuntiva features. They do not replace your company's payroll or filing instructions.

- [Timesheet approval for payroll: what to check before exporting](https://tuntiva.com/en/guides/timesheet-approval-payroll/)
- [Worksite and subcontractor management: connect teams and hours](https://tuntiva.com/en/guides/worksite-subcontractor-management/)

[Tuntiva](https://tuntiva.com/en/)